#

CASE

Haikou airport Comprehensive Bonded Zone multi-functional logistics and warehousing center

16562910812994585579.jpg


The project is located in Haikou City, Hainan Province, with a total of two warehouses, mainly including the hangar with unloading function, the integrated warehouse of the cargo station, the high-end storage trade exhibition and corresponding supporting facilities; Steel frame structure is mainly adopted, and the roof is color steel roof. Among them, Hainan Hangxiao is responsible for the construction of 1 # warehouse, which has three floors. The height of the first floor is 8m, the height of the second floor is 7m, and the height of the third floor is 6.04m. The first floor and the second floor are provided with interlayer, cornice height is 21.04m, ridge height is 22.125m, and the single floor building area is 4158m2.




Recommendation of relevant cases

Contact us

Stock code
600477

Home

Close